C & F Cost(USD):- | 51,08,460.07 |
Erection Cost(USD):- | 1,72,095.26 |
Total Cost(USD):- | 52,80,555.33 |
Scope of project :- | CONSTRUCTION OF 2x60MVA,132/33KV SUBSTATION AT MPU AND 2X132KV LINE BAY EXTENTION AT NNENWE SUBSTATION - LOT 2010-32 |
C & F Cost(USD):- | 35,32,876.30 |
Erection Cost(USD):- | 1,99,894.35 |
Total Cost(USD):- | 37,32,770.65 |
Scope of project :- | CONSTRUCTION OF UGWUAJI - NNENWE 132 KV DOUBLE-CIRCUIT TRANSMISSION LINE - LOT 2011 - 05 |
C & F Cost(USD):- | 57,10,053.42 |
Erection Cost(USD):- | 2,16,568.33 |
Total Cost(USD):- | 59,26,621.75 |
Scope of project :- | CONSTRUCTION OF ONITSHA - OBA - NNEWI - IDEATO - OKIGWE 132 KV DOUBLE-CIRCUIT TRANSMISSION LINE - LOT 2012 - 06 |
Office of the Sr. General manager (construction)- zone 1, Bhubaneswar
Date:- | 19-09-2015 |
Location:- | GODACHHAK SUBSTATION Bhubaneswar |
Client:- | OPTCL |
Cost :- | 44.96 Cr |
Turnkey construction of 220/132/33 kv S/st. at ghodachhak & associated 220 kv LILO line on existing MERAMUNDALI-DUBURI-CKT-1 & 132 KV LILO Line on existing TTPS-Duburi line.
Project Year:- | Sept 2008 |
Location:- | Daman. |
Client:- | Electricity Department Daman & Diu |
Cost :- | 26.78 Cr |
Design, Supply, Erection, Testing & Commissioning of 220/66 Kv Switchyard at Ringanwada, Daman alongwith 220 Kv Double Circuit Transmission Line
Date:- | 09-12-2010 |
Location:- | Shirdi |
Client:- | Maharastra Airport Devlopment company |
Cost :- | 23.84 Cr |
Re-Routing/Shifting of 220 Kv BBLR – EKLAHRE Line & BBLR-Adwadi Line around proposed shirdi airport at shirdi.
Date:- | 29-10-2014 |
Location:- | -PUNE |
Client:- | MSETCL Pune |
Cost :- | 18.55 Cr/- |
Construction of 220 KV MC line from Bridgestone to Chakan Phase II on narrow base tower on turnkey basis.
220/33 Kv VAIRAG Substation :- Office of the superintending Engineer EHV Project Circle, Adm. Building,III rd floor, Block No- 405 Rastapeth Pune.
Date:- | 25-07-2014 |
Location:- | VAIRAG |
Client:- | MSETCL Pune |
Cost :- | 14.28 Cr /- |
Supply of material as well as execution of required work which broadly includes construction of 2x25 MVA, 220/33 Kv T/F (T/F Supplied by MSETCL) & 6X33 Kv outlets along with allied works, erection, testing & commissioning of substation with relevant civil work.
Date:- | 29-10-2014 |
Location:- | Nasik |
Client:- | MSETCL Nasik |
Cost :- | 11.83 Cr /- |
Construction of 132 KV Satana-Taharabad DC Line. Supply & Erection(38.062KM)
Date:- | 23-06-2014 |
Location:- | Talegaon S/st – Urse S/st Transmission Line |
Client:- | MSETCL PUNE |
Cost :- | 10.52 Cr/- |
Work of construction of 220 Kv Talegaon S/st – Urse s/st Transmission Line (Foundation,Erection & Stringing)
Date:- | 29-10-2014 |
Location:- | Amravati. |
Client:- | Bharat Dynamics Limited |
Cost :- | 9 Cr /- |
Construction of compound wall at BDL unit Amravati Maharashtra.
Date:- | 08-05-2006 |
Location:- | 400 Kv Nagothane Substation to 220 Kv Wadkhal S/st. Dist. Raigad. |
Client:- | MSETCL Panvel |
Cost :- | 8.80 Cr /- |
Trunkey construction of 220 Kv D/C Transmission Line from 400 Kv Nagothane Substation to 220 Kv Wadkhal S/st. Dist. Raigad.
Date:- | 08-06-2007 |
Location:- | Pune. |
Client:- | MSETCL Pune |
Cost :- | Cr /- |
Supply of material (Except conductor, Earthwire & Insulator) and work stub setting , Tower erection and stringing of 220 Kv D/C Line Multicircuit tower from Talegaon to Urse.
Date:- | 22.02.2021 |
Location:- | Vashi |
Value:- | 3,54,33,86,23 |
Client:- | MSETCL |
Supply, Erection, Pile foundations and strengthening of existing pile foundations in Creek area for 220 kV Uran-Kharghar line from Location number 83 to 87 under ORC for Navi Mumbai international Airport” (Second call).
Date:- | 22.02.2021 |
Location:- | Amravati |
Value:- | 9,89,08,029 |
Client:- | MSETCL |
Construction of 220 kV Kalmeshwar -Warud DCDC linefrom loc. No 231 to 313 upto Gantry of Warud S/S (Total Loc. 81) Phase –V from Kalmeshwar end of route length 25.7 km route under EHV PCO&M zone, Amravati on turnkey basis under risk and cost of M/s JSL.
Date:- | 02.12.2017 |
Location:- | Vashi |
Value:- | 1,01,16,18,453.09 |
Client:- | MSETCL |
Turnkey Construction of 220kV M/C LILO on 220kV Tarapur- Borivali & Boisar-Ghodbandar line for 400kV Kudus S/s (Twin 27 Kms M/C) under Vashi Zone.
Date:- | 27-01-18 |
Location:- | Odisha |
Value:- | 14,48,88,682 |
Client:- | Odisha Power Transmission Corporation Ltd. |
Diversion of 400KV Meramundali - Duburi D/C line (i) from existing Loc. No. -26/0 to Loc. No.- 29/0 near village Siariamalia (Appx. Line Length: 2.289 Kms), (ii) from existing Loc. No. -16/0 to Loc. No.- 18/0 near village Parjang (Appx. Line Length: 1.680 Kms) and (iii) from existing Loc. No.- 43/0 to Loc. No.- 44/0 near village Dayanabil (Appx. Line Length: 2.524 Kms) for construction of Angul - Sukinda new Railway line on turnkey basis.
Date:- | 16/11/2021 |
Location:- | M/s. GWEL , Warora |
Value:- | 99,77,41,615 /- |
Client:- | MSETCL |
400/220 kV Switchyard at M/s. GWEL for evacuation arrangement for MSEDCL share of 200 MW Power from 2x300MW. Thermal Power Plant Dist. Chandrapur on turnkey basis under Nagpur zone..
Date:- | 09/12/2021 |
Location:- | Mankoli (Bhiwandi). |
Value:- | 46,35,38,932.88 |
Client:- | MSETCL |
Establishment of 220/22 kV GIS substation at Mankoli (Bhiwandi), Dist. Thane under Vashi Zone.
Date:- | |
Location:- | M/s Ordnance Factory, Ambazari Unit (OFAJ) |
Value:- | 16,76,41,655.72 |
Client:- | MSETCL |
Construction of 2x132 kV Endbays at 220 kV Ambazari S/S along with bus extension and 2x132 kV feeder bays at proposed M/s Ordnance Factory s/s along-with construction of 132 kV DCDC line from 220 kV Ambazari S/S to proposed M/s Ordnance Factory s/s - 2 km (O/H line portion - 1.53 km and U/G portion - 0.16 km) under Nagpur zone, on turnkey basis
Date:- | 24/12/2021 |
Location:- | Navi Mumbai |
Value:- | 8,18,20,104 |
Client:- | MSETCL |
Work of Replacement of existing ACSR Conductor on 220 KV Kalwa-Siemens-RCT-Mahape-Tifil Transmission lines with High Tempearature Low Sag(HTLS) Conductor Type-Carbon Core with Aluminium Encapsulation(CCC AECC-TS) on Pilot Basis.
Date:- | 27-01-18 |
Location:- | Odisha |
Value:- | 14,48,88,682 |
Diversion of 400KV Meramundali - Duburi D/C line (i) from existing Loc. No. -26/0 to Loc. No.- 29/0 near village Siariamalia (Appx. Line Length: 2.289 Kms), (ii) from existing Loc. No. -16/0 to Loc. No.- 18/0 near village Parjang (Appx. Line Length: 1.680 Kms) and (iii) from existing Loc. No.- 43/0 to Loc. No.- 44/0 near village Dayanabil (Appx. Line Length: 2.524 Kms) for construction of Angul -Sukinda new Railway line on turnkey basis.
Date:- | 22.02.2021 |
Location:- | Amravati |
Value:- | 9,89,08,029 |
Client:- | MSETCL |
Construction of 220 kV Kalmeshwar -Warud DCDC linefrom loc. No 231 to 313 upto Gantry of Warud S/S (Total Loc. 81) Phase –V from Kalmeshwar end of route length 25.7 km route under EHV PCO&M zone, Amravati on turnkey basis under risk and cost of M/s JSL.